
Ten services, one crew. Every project includes prep, installation, and the finish work that makes a floor look done.
We remove old flooring as needed, check the subfloor, and prepare a flat surface before laying the planks. The installation includes clean seams, doorway transitions, thresholds, and baseboards or shoe molding. Old material is hauled away and the room is cleaned up.
LVP Flooring Installation →We prepare the subfloor and plan the board layout before installation. Cuts around cabinets, hearths, and doorways receive the same attention as stairs, transitions, and trim. Tear-out and cleanup are handled as part of the work.
Hardwood Flooring Installation →Old flooring is removed and hauled away before subfloor preparation and underlayment. We fit the locking planks with even seams and plan transitions between rooms. Baseboards and trim finish the edges, and the work area is cleaned up.
Laminate Flooring Installation →We remove the old carpet and pad, prepare the subfloor, and fit new pad and carpet. The carpet is stretched tight with clean seams and edges, including stairs and landings where needed. Old material is disposed of and the room is left clean.
Carpet Installation →We prepare the substrate and waterproof wet areas before setting tile. Floors, shower pans, niches, tub surrounds, and backsplashes are laid out for clean cuts and grout lines. Grout, caulk, and finish detailing complete the work before cleanup.
Tile Flooring & Shower Installation →Concrete grinding and cleaning come first, followed by crack and joint repair where needed. We apply the coating to the prepared slab for garages, shops, and commercial floors. You receive guidance on cure time and care before the space returns to use.
Epoxy Flooring →We look at the damage and whether the existing material can be matched before recommending a repair. Work can include replacing planks or tiles, patching or stretching carpet, and addressing squeaks or subfloor issues. Transitions and trim are repaired where needed, with cleanup at the end.
Flooring Repair →We pull up old carpet, pad, laminate, vinyl, hardwood, or tile and remove the debris. The exposed subfloor is inspected and prepared for the next floor. Removal-only projects are welcome, and the site is left clean.
Flooring Removal & Tear-Out →We remove old trim as needed and fit baseboards, shoe molding, and door casings. Corners and transitions are cut carefully, then caulked and filled for a paint-ready finish. Trim-only jobs are welcome, with old material removed and the work area cleaned.
Baseboard Installation →We check moisture, flatness, and the condition of the surface before new flooring goes down. Concrete may need grinding, cleaning, patching, or leveling, while wood subfloors may need repair and fastening. Prep is matched to the floor being installed above it.
Concrete & Subfloor Prep →
Call, text, or send us a message about your project. Quotes are always free.